Work on the new The Boston Witham Academies Federation (BWAF) wireless network has begun. This will be the first wireless link we have in Boston.


Our Mission

This project aims to join as many of the BWAF academy schools together with wireless links. This is to minimise the use of external ISPs and maximize efficiency when dealing with network faults.Boston Link

This first link, from the Haven High academy campus to Park Academy primary school, is a proof of concept link for testing before the rest of the project is given the green light.

This makes use of wireless technology. Which means the schools link has been upgraded in a matter of hours from a single 10Mbps link, to a link with a capacity of 655mbps. As a result this will allow for servers in the school to be removed and managed at our central DC via a lease line to haven high.

These works move towards the vision of a single unified network for the BWAF. Allowing for pooled resources and central spending keeping costs down whilst maximising network access and speed.

Watch this space, and follow our progress!

AIT’s New Offsite Backup Facility

April sees the commissioning of AIT’s New Offsite Backup Facility.


Installation

AIT's New Offsite Backup Facility

One of our technicians at work, during the installation.

The facility in question was in a previous life a O2 telecoms site, after the handover from O2 to AIT in November works have been underway to install two 1Gbps capacity wireless links to our Main DC at George Spencer.

Each link is a Ubiquiti link using both the 24Ghz and 5Ghz band to give full redundancy and reliability.

 

 


Testing

After installing the first backup server in March (a 200tb storage array made up of 10tb drives), testing on the link capacity as well as the servers and writing capacity have now been complete and starting to hold live backup data of our servers.


Future

The next set of backup servers will be installed later this year after they have been decommissioned from our old facility and rebuilt with new 10tb drives.

This facility has a dedicated power supply and UPS on site as well as full air-conditioning and alarm systems all sealed behind a half tone door with a custom manufactured lock for extra protection.